Shipping to India from China or Taiwan? Compare Nhava Sheva, Mundra and Chennai, see the duty stack with a worked example, and check 2026 BIS rules.
By Paul Liang | Mingsung International Logistics · Reviewed · 11 min read
- 12–18 daysEast China to Nhava Sheva or Chennai by sea
- 30.98%Border charge at 10% duty and 18% IGST
- 6–8 monthsTypical time for a BIS factory licence
Bottom line
The ocean leg is short, and the shipment is won or lost on three things at the Indian border
Sea freight from East China to India's main ports takes about two to three weeks. What stops cargo is rarely the ship. It is a product that needs a Bureau of Indian Standards (BIS) licence the factory does not hold, a duty bill the importer did not model, or a bill of lading that fails India's manifest rules.
Three things to get right:
- BIS certification belongs to the factory, and it takes months. For products under a Quality Control Order (QCO), the foreign manufacturer must hold the licence before the goods ship. A factory-audit licence typically takes six to eight months.
- Duty is a stack, not a single rate. Basic customs duty, a 10% surcharge on that duty, then integrated GST on top of both. A 10% duty with 18% GST comes to 30.98% of the CIF value.
- The Indian consignee's details must be right before sailing. The consignee's Import Export Code (IEC) and full address go on the bill of lading, and manifest corrections close eight hours before arrival.
China and Taiwan to India, door to door
-
Origin · before sailing
Booking, export declaration and shipping instruction at Shanghai, Ningbo, Shenzhen or Kaohsiung
Check first: the factory’s BIS licence
-
Ocean · 12–18 days
East China to Nhava Sheva or Chennai; about 16 days from Kaohsiung to Nhava Sheva
On the bill: consignee’s IEC and full address
-
Customs · the duty stack
Basic duty, a 10% surcharge on that duty, then IGST on the total
Example: 10% duty + 18% IGST = 30.98%
-
Inland delivery
Road or rail from Nhava Sheva, Mundra or Chennai to the consignee
Watch: monsoon congestion, June to September
Which Indian port should you use?
Pick the port by where the consignee is, then check which services call there.
| Port | Coast | What it serves | Scale |
|---|---|---|---|
| Nhava Sheva (JNPA) | West | Mumbai, Pune and western India by road and rail | 8.17 million TEU in the year to March 2026 |
| Mundra | West | Gujarat and north India along the Delhi–Mumbai industrial corridor | More than 7 million TEU a year |
| Chennai | East | Tamil Nadu's manufacturing belt | 1.82 million TEU in the year to March 2025 |
| Vizhinjam | South-west | Transshipment hub in Kerala | About 1.3 million TEU in the year to March 2026 |
Source: Maritime Gateway, Sep 2026; FreightAmigo, Jun 2026
About a quarter of India's import and export containers are still transshipped at foreign hubs, mainly Colombo, Singapore and Port Klang. A booking to a smaller Indian port often means a feeder leg from one of them.
How long does shipping take?
| Route | Port-to-port time | Notes |
|---|---|---|
| Shanghai, Ningbo or Shenzhen to Nhava Sheva or Chennai | 12–18 days | Weekly direct services, per DP World's lane guide |
| Kaohsiung to Nhava Sheva | About 16 days at the fastest | One to two sailings a week |
Source: DP World; Fluent Cargo
Direct carriers listed on the Kaohsiung–Nhava Sheva lane include Evergreen, ONE, TS Lines, Wan Hai, Maersk, Hapag-Lloyd and Interasia.
Add time at both ends: export clearance and cut-off at origin, then customs clearance and inland transport in India. Weather matters too. In August 2026, typhoons closed Shanghai and Ningbo-Zhoushan for a time and delays of 7 to 21 days were common on the affected services.
What duty and tax will the importer pay?
India charges import duty in layers, each calculated on the one before.
| Layer | Calculated on | Rate |
|---|---|---|
| Basic customs duty (BCD) | CIF value | Set by tariff code |
| Social welfare surcharge (SWS) | The BCD amount | 10% of BCD |
| Integrated GST (IGST) | CIF value + BCD + SWS | Mostly 5% or 18% since the September 2025 rate reform |
| Anti-dumping or safeguard duty | Per unit or per tonne, where an order applies | Product- and origin-specific |
Source: Customs Compliance AI; Upstox: GST rates
Worked example: ₹1,000,000 of goods at 10% duty and 18% GST
| Item | Calculation | Amount (₹) |
|---|---|---|
| CIF value | — | 1,000,000 |
| Basic customs duty | 1,000,000 × 10% | 100,000 |
| Social welfare surcharge | 100,000 × 10% | 10,000 |
| IGST | 1,110,000 × 18% | 199,800 |
| Total duty and tax | — | 309,800 |
| Share of CIF value | — | 30.98% |
Source: Customs Compliance AI
Two points on origin:
- Taiwan has no trade agreement with India, so standard rates apply. China and India are both members of the Asia-Pacific Trade Agreement, which gives limited preferences on listed tariff lines.
- Check for anti-dumping duty before you quote. One tracker counted 192 anti-dumping measures in force in India in April 2026. Measures on Chinese goods include certain steel products and refrigerant gas.
The February 2026 budget did not change the structure. From May 1, 2026 many exemption notifications were moved into the tariff schedule itself, which the government says leaves the effective duty unchanged. It also extended duty deferral for trusted importers from 15 to 30 days.
Does your product need BIS certification?
India makes BIS certification compulsory for a product by issuing a Quality Control Order. As of March 2025 there were 187 orders covering more than 679 product categories, and the list keeps growing.
| Scheme | Typical products | How it works | Time and cost |
|---|---|---|---|
| Foreign Manufacturers Certification Scheme (ISI mark) | Steel, appliances, furniture, footwear, chemicals | BIS audits the factory, tests sealed samples, then licenses the manufacturer | About 6–8 months; roughly US$8,000–30,000 |
| Compulsory Registration Scheme | Electronics and IT products | Samples tested in a BIS-recognized lab; no factory audit | Shorter; depends on lab queue |
Source: India Briefing
The licence is issued to the manufacturer, for a named factory. The foreign manufacturer must also appoint an Authorised Indian Representative based in India, who carries legal responsibility there. Regulated goods without the BIS mark cannot be imported or sold.
Dates that matter in late 2026 and 2027
| Date | Change |
|---|---|
| January 14, 2026 | The machinery and electrical equipment safety order of 2024 was rescinded before it took effect |
| February 13, 2026 | Furniture order in force |
| October 1, 2026 | Electrical appliances order of 2026 in force |
| November 30, 2026 | Last bill of lading date for the furniture relief described below |
| December 1, 2026 | Wrought aluminium products come under their order |
| January 26, 2027 | New television standard (IS 18112) applies, moved from July 2026 |
| April 1, 2027 | Hand tools order in force; glass screen protectors join the registration scheme |
What must be right on the bill of lading and at filing?
India's sea cargo manifest rules put data duties on the carrier, the forwarder and the importer.
| Requirement | Detail |
|---|---|
| Consignee | Must show a valid IEC and full address. Foreign consignees are generally not permitted |
| House and master bill numbers | Must be different, or the manifest filing can be rejected |
| Consolidated cargo | The console agent files its details no later than 72 hours before arrival |
| Manifest amendments | Filed no later than 8 hours before arrival |
| Bill of Entry | Needs the importer's IEC, GSTIN and bank AD code; documents are uploaded through ICEGATE |
| Late Bill of Entry | ₹5,000 a day for the first three days, then ₹10,000 a day |
Source: Maersk advisory, Sep 2026; Cogoport; Expeditors
Since August 31, 2026, manifest amendments have been filed in the upgraded ICEGATE 2.0 system. Since February 1, 2026, customs releases cargo automatically for all importers once duty is paid and no compliance alert is open.
A 6-step plan before your next shipment to India
-
Classify the product and check for a Quality Control Order
Get the eight-digit Indian tariff code from the importer. Check whether a QCO covers it and on what date.
-
Confirm the factory's BIS status
Ask the supplier for the licence or registration number and the factory address on it. If there is none, build the certification time into the plan.
-
Model the duty stack
Calculate BCD, the 10% surcharge and IGST on the CIF value. Then check for anti-dumping duty by product and origin.
-
Choose the port by the consignee's location
Nhava Sheva or Mundra for the west and north, Chennai for the south-east. Ask whether the service is direct or via a hub.
-
Collect the importer's identifiers
IEC, GSTIN, AD code and the exact legal name and address, before the booking is confirmed.
-
Agree who files what, and when
The carrier files the manifest, the console agent files house-level details, and the importer's broker files the Bill of Entry. Set a date for each.
Frequently asked questions
How long does sea freight take from China to India?
About 12 to 18 days port to port from Shanghai, Ningbo or Shenzhen to Nhava Sheva or Chennai on a direct service. Add origin cut-off, Indian customs clearance and inland transport.
How long does shipping take from Taiwan to India?
The fastest listed service from Kaohsiung to Nhava Sheva takes about 16 days, with one to two sailings a week. Other Indian ports may need a transshipment.
Which Indian port is best for Delhi and north India?
Mundra and Nhava Sheva are the usual gateways. Mundra sits on the Delhi–Mumbai industrial corridor, and Nhava Sheva has the most services. Compare inland cost and current congestion.
How is import duty calculated in India?
Basic customs duty on the CIF value, plus a social welfare surcharge of 10% of that duty, plus IGST on the total. At 10% duty and 18% IGST, the charge is 30.98% of CIF.
Does Taiwan have a free trade agreement with India?
No. Goods of Taiwanese origin pay India's standard rates. China and India are both in the Asia-Pacific Trade Agreement, which covers a limited list of tariff lines.
Who applies for BIS certification, the importer or the factory?
The manufacturer. The licence is tied to the factory, and a foreign manufacturer must appoint an Authorised Indian Representative based in India. The importer should verify the licence before ordering.
How long does BIS certification take?
A factory-audit licence under the Foreign Manufacturers Certification Scheme typically takes six to eight months. Registration for electronics is faster because it relies on lab testing without a factory audit.
Can a foreign company be the consignee on a bill of lading to India?
Generally no. Carriers require an Indian consignee with a valid Import Export Code and a full address, because customs checks those details in the manifest.
What happens if the Bill of Entry is filed late?
Customs charges ₹5,000 a day for the first three days of delay and ₹10,000 a day after that. Port storage and container detention add to the cost.
Is IGST on imports a real cost?
Not for a GST-registered importer. IGST paid at import can be claimed as input tax credit, provided the importer's GSTIN is declared on the Bill of Entry.
About this guide
- Last reviewed
- Experience
- Written by Paul Liang at Mingsung International Logistics in Taipei. Mingsung handles FCL and LCL ocean exports from Taiwan and mainland China and runs its own cross-strait services. This guide is written from the origin side: what the shipper and forwarder must get right before the container sails.
- Coverage
- Covers Indian port choice, ocean transit times, the import duty stack, BIS schemes and 2026–2027 Quality Control Order dates, and sea cargo manifest and Bill of Entry requirements.
- Based on
- Based on Maritime Gateway's South Asia Container Market 2026 report, DP World and Fluent Cargo lane data, India Briefing's BIS guide, a dated ledger of 2026 QCO changes, Maersk's India customs advisory, and published summaries of India's 2026 budget and Customs Act.
- Please note
- General information, not customs or legal advice. Duty rates apply at the eight-digit tariff code and QCO dates change by gazette notification. Confirm classification, BIS scope and current dates with a licensed Indian customs broker. Mingsung is not a customs broker in India and does not arrange BIS certification.
Update log
- First published. Quality control order dates checked against a ledger updated November 2, 2026.
- Scheduled update: furniture relief outcome and January 2027 QCO dates.
More in this series
Sources
- Maritime Gateway — South Asia Container Market 2026
- FreightAmigo — Top 10 ports in India by cargo volume, FY 2025-26
- DP World — Shipping from China to India
- Fluent Cargo — Taiwan to India routes
- Metro Global — Customer advisory: India and China container shipping disruption, August 12, 2026
- Customs Compliance AI — India import duty guide 2026: BCD, IGST, SWS, anti-dumping
- Upstox — GST Council adopts two-tier 5% and 18% tax rates from September 22
- TaxGuru — Key customs and central excise proposals in Budget 2026
- India Briefing — Guide to BIS certification in India for foreign manufacturers
- Comploa — New import rules 2026: every BIS, QCO and EPR change, dated
- Free Press Journal — Furniture importers get relief subject to three deadlines
- Approve-IT — India BIS to resume certifications for applications from China
- Maersk — India customs: ICEGATE 2.0 supplementary manifest filing
- Cogoport — Bill of Entry filing in India
- Expeditors — India announces changes relating to the Customs Act